§ 250-25. Excavation and inspection of trenches.  


Latest version.
  • After the owner has received a permit and paid the necessary charges, he shall have the trench for the house sewer pipe excavated to true line and grade. No trench shall be backfilled until after the completed house sewer pipe has been inspected and passed by the Director of Water and Sewer Operations. The backfill shall be free from stones larger than six inches in diameter and shall be satisfactorily compacted either by tamping or flushing, or both. The property owner or agent shall keep the trench to proper grade until final settlement is completed.